The rest of the Stirlingshire Stitchers and I had a lovely time in Killearn on Saturday. The drive up through the beautiful scenery with the sun shining made for a perfect spring day (we’ll not mention the freezing wind) and the company wasn’t bad either.
This week I’m looking forward to 4 glorious days off for Easter, I almost can’t contain myself with the prospect of no work and no other plans. I may have to set 1 day aside for adulting, but that still leaves 3 days, right?
Finishes This Week:
Niet
In Progress This Week:
I don’t have any photos, but on Saturday I got about 90% of the way through making a top from bee blocks that are about 5 years old, and I’ve decided to send the top to this year’s Sibling’s Together quilt drive. Hopefully I’ll have photos of a finish after the next meet up in Killearn.
Outside of that I got some more blocks done for my 90 blocks project:

To Be Worked On This Week:
- I’ll no doubt get some more 90 blocks done
- Other than that I’m committing to nothing!
Hope you have a great week and that the bunny is good to you!